+91 92441 40560 sinter.hydraulics@sinterhydraulics.com

Quality You Can Verify

Our quality management system is independently certified and audited. Every machine we build meets international standards for safety, performance, and manufacturing quality.

Certifications & Approvals

Our Credentials

ISO 9001 ISO 9001:2015 — Quality Management

Our quality management system is certified to ISO 9001:2015 by Bureau Veritas. This covers all design, engineering, manufacturing, and after-sales processes.

CE Mark CE Machinery Directive 2006/42/EC

All presses exported to the EU and European Economic Area carry CE marking, certifying compliance with the Machinery Directive for safety and electromagnetic compatibility.

BIS Bureau of Indian Standards

Electrical panels and control systems comply with relevant BIS standards for industrial machinery, including IS 13947 for low-voltage switchgear and IS 4029 for electric motors.

PESO Petroleum & Explosives Safety Org

Presses designed for use in hazardous areas (Zone 1/Zone 2) carry PESO approval for flame-proof electrical panels and hydraulic system design.

NSIC National Small Industries Corp

Registered with NSIC, enabling participation in government tenders and public sector machine procurement across all Indian states and union territories.

MSME Micro, Small & Medium Enterprises

Udyam Registration as a Medium Enterprise under the MSME Act, reflecting our commitment to Indian industrial development and manufacturing competitiveness.

CE Mark CSA SGS Bureau Veritas Standards Australia MSME ZED

How We Build Quality In

Our Quality Process

1

Design Review

Every new machine design undergoes formal design FMEA before release to production

2

Incoming Inspection

All critical bought-out items (cylinders, valves, seals) are incoming-inspected against test certificates

3

In-Process Checks

Stage-wise inspection at fabrication, machining, and sub-assembly with recorded inspection reports

4

Pressure Testing

All hydraulic circuits pressure-tested at 1.5× rated working pressure before installation

5

Final Run-Off

Every press completes a documented 50-cycle run-off at rated load before dispatch clearance

Design Standards

Standards We Design To

StandardTitleApplies ToStatus
IS 8833Hydraulic Presses — Safety RequirementsAll press modelsCompliant
EN 693Machine Tools — Safety — Hydraulic PressesExport machinesCompliant
IS 13947Low Voltage Switchgear & Control GearAll electrical panelsCompliant
ISO 4413Hydraulic Fluid Power — General RulesHydraulic systemsCompliant
IEC 60204-1Safety of Machinery — Electrical EquipmentAll machinesCompliant
IS 2825Code for Unfired Pressure VesselsHydraulic accumulatorsCompliant
IS 4029Guide to Testing of Three-Phase Induction MotorsAll drive motorsCompliant

Need a test certificate or quality documentation for your order?